Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Now 14General

Two-Week Traffic Disruptions Begin at KKL Bridge in Tel Aviv Starting August 15

Translated & summarized from Now 14 by baba

Right

Hebrew · 6 newsrooms covering

Maintenance work on the KKL Bridge in Tel Aviv-Jaffa will cause lane closures and traffic disruptions from August 15 to 28, with alternating closures in each direction. The Ayalon Highway will remain open, but heavy congestion is expected, and public transport routes will be affected.

The story in 6 lines · by baba

  • KKL Bridge in Tel Aviv-Jaffa will undergo two weeks of maintenance starting August 15.
  • West-to-east lanes close first from August 15 to 21; east-to-west lanes close from August 22 to 28.
  • Ayalon Highway (Route 20) remains open despite bridge lane closures.
  • Heavy traffic congestion expected near KKL interchange; drivers advised to use alternate routes.
  • Public transportation routes and stops will be altered during the maintenance period.
  • Work is coordinated by the Ministry of Transportation, Tel Aviv Municipality, and Netivei Ayalon with police supervision.
Two-Week Traffic Disruptions Begin at KKL Bridge in Tel Aviv Starting August 15
Editorial illustration generated by baba News, not a photograph of the event.

Starting Saturday night, August 15, significant traffic disruptions will occur at the KKL Bridge in Tel Aviv-Jaffa due to essential maintenance and safety work. The project will last two weeks, with alternating closures of the bridge's traffic lanes in both directions. The first phase, from August 15 at 23:30 until August 21 at 06:00, will close west-to-east lanes for joint replacement work. During this period, access to Route 20 southbound from the KKL interchange remains open, and certain turns from Ayalon South and North will be restricted or allowed accordingly. Pedestrian access on the northern part of the bridge will be maintained.

The second phase will start on August 22 at 23:30 and continue until August 28 at 06:00, closing the east-to-west lanes. Detailed traffic arrangements for this phase will be announced closer to the date. Despite these closures, the main Ayalon Highway (Route 20) will stay open throughout the maintenance. However, heavy traffic congestion is expected near the interchange, and drivers are advised to plan alternative routes.

Public transportation routes and stops in the affected area will also be modified during the works. The maintenance is coordinated by the Ministry of Transportation and Tel Aviv-Yafo Municipality through Netivei Ayalon, with traffic supervisors and the Israel Police overseeing the operation. Drivers are urged to check traffic updates before traveling to minimize delays.

Now 14Right · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire