Full coverage· General· Updated
Tel Aviv's KKL Bridge Closes for Two Weeks of Major Safety Repairs
Tel Aviv's KKL Bridge will close for two weeks starting August 15 for major safety and maintenance work, causing significant traffic disruptions and public transport changes. The closure will occur in two phases, first west-to-east lanes, then east-to-west, with Highway 20 remaining open throughout.
6 newsrooms · 1 language · sincePlus
What happened
- 01KKL Bridge in Tel Aviv closes for two weeks starting August 15 for safety repairs.
- 02First phase closes west-to-east lanes from August 15 to 21, second phase east-to-west from August 22 to 28.
- 03Highway 20 lanes remain open during the entire closure period.
- 04Traffic changes include restricted left turns from Ayalon South and maintained pedestrian access on the bridge.
- 05Public transport routes and stops will be altered; coordination with Israel Police is in place.
- 06Netivei Ayalon advises drivers to use alternative routes and Waze app for navigation.
The coverage
6 newsrooms on this story
Who covered it
- LeftNone
- Centre2
- Right2
- Haredi1
- ArabNone
- Other1
How it broke
See which of the 6 newsrooms broke it, and who waited
