Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· General· Updated

Tel Aviv's KKL Bridge Closes for Two Weeks of Major Safety Repairs

Tel Aviv's KKL Bridge will close for two weeks starting August 15 for major safety and maintenance work, causing significant traffic disruptions and public transport changes. The closure will occur in two phases, first west-to-east lanes, then east-to-west, with Highway 20 remaining open throughout.

6 newsrooms · 1 language · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

Tel Aviv's KKL Bridge Closes for Two Weeks of Major Safety Repairs
Illustration by baba

What happened

  1. 01KKL Bridge in Tel Aviv closes for two weeks starting August 15 for safety repairs.
  2. 02First phase closes west-to-east lanes from August 15 to 21, second phase east-to-west from August 22 to 28.
  3. 03Highway 20 lanes remain open during the entire closure period.
  4. 04Traffic changes include restricted left turns from Ayalon South and maintained pedestrian access on the bridge.
  5. 05Public transport routes and stops will be altered; coordination with Israel Police is in place.
  6. 06Netivei Ayalon advises drivers to use alternative routes and Waze app for navigation.
Translated and summarized by baba from Mako, the latest report. Read Mako’s original

The coverage

6 newsrooms on this story

Who covered it

  • LeftNone
  • Centre2
  • Right2
  • Haredi1
  • ArabNone
  • Other1

How it broke

See which of the 6 newsrooms broke it, and who waited