Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

WallaSecurity

Power Line Damage Disrupts Overnight Train Service in Israel

Translated & summarized from Walla by baba

CenterNeutral tone

Hebrew · 9 newsrooms covering

Overnight train services in Israel were disrupted due to damage to electrical lines caused by infrastructure work by the Israel Electric Corporation near Shapim. Repairs were completed by morning, and services gradually resumed.

The story in 5 lines · by baba

  • Overnight train services disrupted by electrical line damage.
  • Israel Electric Corporation's work caused the damage near Shapim.
  • Service was suspended between Tel Aviv and Netanya.
  • Passengers faced difficulties reaching destinations like Ben Gurion Airport.
  • Repairs were completed by early morning, with services resuming.
Power Line Damage Disrupts Overnight Train Service in Israel
Editorial illustration generated by baba News, not a photograph of the event.

Overnight train services in Israel experienced significant disruptions due to damage to the overhead electrical lines caused by infrastructure work conducted by the Israel Electric Corporation near the community of Shapim. The incident occurred when a cable being worked on by the electric company's crews struck the railway's electrification system, leading to a temporary halt in train movement.

The disruption primarily affected passengers traveling between Tel Aviv (Savidor Central station) and Netanya, impacting those heading to Ben Gurion Airport (Natbag) from northern Israel. Passengers were forced to seek alternative transportation, such as taxis, to reach their destinations.

Israel Railways dispatched teams to the scene to repair the damaged electrical cables. The company announced shortly after 6 a.m. that the fault had been repaired and that train services were gradually returning to normal.

This incident highlights the ongoing challenges of coordinating infrastructure work between different utility companies and the national railway system to prevent disruptions for commuters.

WallaCentre · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire