Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal
Compare full coverage across 10 outlets
By וואלה רכבOngoing story · 5 updates
Security05:03 · Sep 6

Power Line Damage Disrupts Overnight Train Service in Israel

WallaCenter
Translated & summarized from Walla by baba
The story · English

Overnight train services in Israel experienced significant disruptions due to damage to the overhead electrical lines caused by infrastructure work conducted by the Israel Electric Corporation near the community of Shapim. The incident occurred when a cable being worked on by the electric company's crews struck the railway's electrification system, leading to a temporary halt in train movement.

The disruption primarily affected passengers traveling between Tel Aviv (Savidor Central station) and Netanya, impacting those heading to Ben Gurion Airport (Natbag) from northern Israel. Passengers were forced to seek alternative transportation, such as taxis, to reach their destinations.

Israel Railways dispatched teams to the scene to repair the damaged electrical cables. The company announced shortly after 6 a.m. that the fault had been repaired and that train services were gradually returning to normal.

This incident highlights the ongoing challenges of coordinating infrastructure work between different utility companies and the national railway system to prevent disruptions for commuters.

Read the original at Walla
Full coverage · 10 outlets
67% centerFirst: Ynet · Sep 5

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Center 4Right 2Unrated 4
Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Who covered this

3 centre2 right

  • Centre3 / 11
  • Right1 / 4
  • Haredi press1 / 3
  • Russian press1 / 5
  • Business press3 / 5

With News Plus: who filed first, and how long each one waited

Open the live terminal