Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Ongoing Story· Day 2

Israel Approves First Metro Station Construction Permit

2 developments

MaarivSecurity

Israel Approves First Metro Station Construction in Gush Dan

Translated & summarized from Maariv by baba

CenterNeutral tone

Hebrew · 7 newsrooms covering

Israel has approved the construction of its first metro station in Ariel Sharon Park, Gush Dan, on the M3 line. The project involves excavating 300,000 cubic meters of earth and building underground structures up to 38 meters deep. Construction is expected to take 24 months, with environmental impact studies showing no expected breaches of noise limits.

The story in 5 lines · by baba

  • Israel has approved the construction of its first metro station in Ariel Sharon Park.
  • The station is part of the M3 metro line in the Gush Dan region.
  • Construction involves excavating 300,000 cubic meters of earth and building 38-meter deep structures.
  • The project is expected to take approximately 24 months to complete.
  • Environmental surveys indicate no expected violations of noise level restrictions.
Israel Approves First Metro Station Construction in Gush Dan
Editorial illustration generated by baba News, not a photograph of the event.

For the first time, approval has been granted for the construction of a metro station in Israel, located in Ariel Sharon Park as part of the M3 line. This initial phase of work involves extensive engineering and infrastructure development, including the excavation and removal of approximately 300,000 cubic meters of earth. The project will also see the construction of underground support structures reaching a depth of about 38 meters, reinforced by nine rows of ground anchors, and the preparation of infrastructure for the station and the metro tracks.

The construction work is slated to last for approximately 24 months. During this period, a dedicated staging site will be established, encompassing offices, logistical areas, an earth drying zone, a bentonite filtration facility, a water purification plant, a temporary electrical switch room, and lighting systems. The station is situated in an open area, approximately 230 meters from a residential zone and 350 meters from a park. According to NTA (National Transport Infrastructure Company), environmental surveys indicate that noise level restrictions are not expected to be exceeded.

MaarivCentre · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire