Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· General· Updated

KKL Bridge Opens West to East Ahead of Schedule, East to West Closure Starts Saturday for Maintenance

The KKL Bridge has reopened for west-to-east traffic after initial rehabilitation, but east-to-west traffic will be closed from August 22 to 28 for maintenance including joint replacement. Ayalon Highway remains open during this period.

2 newsrooms · 1 language · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

What happened

  1. 01KKL Bridge reopened for west-to-east traffic ahead of schedule.
  2. 02East-to-west traffic on the bridge will be closed from August 22 to 28.
  3. 03Left turns from Ayalon North to KKL Bridge and from east to Ayalon South will be prohibited.
  4. 04Maintenance includes replacing expansion joints as part of comprehensive rehabilitation.
  5. 05Ayalon Highway (Route 20) remains open throughout the maintenance period.
Translated and summarized by baba from Ynet, the latest report. Read Ynet’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • Centre1
  • Right1
  • HarediNone
  • ArabNone

How it broke

See which of the 2 newsrooms broke it, and who waited