Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Tech· Updated

Israel to Launch Driverless Metro in 2037 With $50 Billion Train and Tech Tender

Israel's NETA company is tendering 30 billion shekels for automated trains and technology for the Gush Dan metro, with a total project cost of 180 billion shekels. The first driverless trains are expected to launch in 2037, with the full network completion by 2040.

2 newsrooms · 2 languages · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

Israel to Launch Driverless Metro in 2037 With $50 Billion Train and Tech Tender
Illustration by baba

What happened

  1. 01Israel's Gush Dan metro project will cost an estimated 180 billion shekels.
  2. 02A 30 billion shekel tender is underway for automated trains and technology systems.
  3. 03The first driverless trains are scheduled to begin service in 2037.
  4. 04The metro will comprise three lines totaling approximately 150 kilometers with 109 stations.
  5. 05The system is designed to handle an estimated 600 million passenger trips annually.
  6. 06The project aims for full network completion by approximately 2040.

The project involves three lines, 109 stations, and an annual capacity of 600 million trips. The technology, operating under the GoA4 standard, has decades of international operational history.

Translated and summarized by baba from NEWSru Israel, the latest report. Read NEWSru Israel’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • Haredi1
  • ArabNone
  • Other1

How it broke

See which of the 2 newsrooms broke it, and who waited