Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

NEWSru IsraelTech

Israel to Launch Driverless Metro in 2037 With $50 Billion Train and Tech Tender

Translated & summarized from NEWSru Israel by baba

CommunityNeutral tone

Russian · 1 newsroom

Israel's NETA company is tendering 30 billion shekels for automated trains and technology for the Gush Dan metro, with a total project cost of 180 billion shekels. The first driverless trains are expected to launch in 2037, with the full network completion by 2040. The project involves three lines, 109 stations, and an annual capacity of 600 million trips. The technology, operating under the GoA4 standard, has decades of international operational history.

The story in 6 lines · by baba

  • Israel's Gush Dan metro project will cost an estimated 180 billion shekels.
  • A 30 billion shekel tender is underway for automated trains and technology systems.
  • The first driverless trains are scheduled to begin service in 2037.
  • The metro will comprise three lines totaling approximately 150 kilometers with 109 stations.
  • The system is designed to handle an estimated 600 million passenger trips annually.
  • The project aims for full network completion by approximately 2040.

NETA, the company overseeing the construction of the metropolitan subway system in the Gush Dan region (Greater Tel Aviv), is initiating a tender valued at approximately 30 billion shekels for the supply of fully automated trains and the necessary technological systems. According to Ynet, the driverless trains are slated to begin passenger service in 2037. The total estimated cost for the subway project is around 180 billion shekels. The initial phase, focusing on tunnel and station construction, is budgeted at approximately 65 billion shekels, with an additional 30 billion shekels allocated for the second phase, which includes the procurement of trains, control systems, power supply, communications, station equipment, and ongoing maintenance.

In June, 22 international companies from India, China, the United States, and European nations, along with 11 Israeli firms, expressed interest in participating in the project. The Gush Dan metro will feature three lines spanning roughly 150 kilometers, with 109 underground stations across 24 municipalities. The system is projected to handle about 600 million passenger trips annually. The first section is expected to open in 2037, with the entire network anticipated to be completed by 2040. Depots are already under construction in Petah Tikva and Rishon Le Zion, and tunnel boring is scheduled to commence in about 18 months.

The driverless trains will operate under the GoA4 (Grade of Automation 4) international standard, the highest level of automated railway control, allowing for operation without onboard personnel. This system relies on Communications-Based Train Control (CBTC) technology for continuous data exchange between trains and infrastructure. Computers will manage speed, acceleration, braking, and precise platform stops, with safety systems monitoring speed and distance, capable of initiating an emergency stop. While movement is supervised from a control center, critical safety functions are handled by onboard and infrastructure-based systems. The Gush Dan project will leverage distributed computing and AI, processing data locally for faster responses and operational continuity during communication disruptions. Automation enables shorter headways, increased capacity, and reduced operational costs, but requires robust backup, cybersecurity, and constant equipment monitoring.

Fully automated metros have been in operation globally for over four decades, with the Lille Metro in France being one of the earliest in 1983. Paris has operated automated Line 14 since 1998 and later automated its historic Line 1. Singapore has had fully automated lines since 2003, and Copenhagen has used an automatic system since its metro opened in 2002. Dubai has operated driverless trains since 2009. By 2023, the International Association of Public Transport reported 60 urban areas worldwide with fully automated metro lines, meaning the technology will have over 50 years of commercial operation by the time the Gush Dan metro opens.

Keep up with

NEWSru IsraelOther · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

TechTopic

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire