מבזקים

התחברות ל-baba News

חשבון אחד לאתר, לאייפון ולאנדרואיד — המנוי נשאר איתכם.

או קוד במייל

חיפוש סיפורים

הקלידו לפחות שני תווים. התוצאות מגיעות מכל המערכות ש-baba קורא.

↑↓ למעבר · ↵ לפתיחה · esc לסגירה

התחברות ל-baba News

התחברו כדי להמשיך לשאול. News Plus מסיר את המגבלה היומית.

או קוד במייל

Makoכללי

Major Traffic Restrictions Begin at Tel Aviv's Bridge of Peace for Upgrades

תומצת מתוך Mako על ידי baba

מרכזטון ענייני

עברית · 3 מערכות מסקרות

Starting August 23, major traffic restrictions will affect the Bridge of Peace area in Tel Aviv due to upgrade works, including full closure of the northbound Ayalon exit from the west and lane reductions on the bridge. The works will run nightly until August 26 and continuously from August 27 to 30. Ayalon Highway remains open, with detours advised for westbound drivers. Public transport and pedestrian access will continue with adjustments at Tel Aviv HaShalom train station for escalator replacements.

הידיעה ב-6 שורות · תקציר של baba

  • Northbound exit to Ayalon Highway from west Tel Aviv closes completely starting August 23.
  • Lane reduction on Bridge of Peace westbound will occur alongside nightly closures.
  • Restrictions run nightly 22:00-05:00 until August 26, then continuously from August 27 to 30.
  • Ayalon Highway remains open in both directions during the works.
  • Detours recommended via Derech HaShalom and Yigal Alon or Yitzhak Sadeh streets.
  • Bus lines operate normally; pedestrian bridge access remains open with supervision.

Starting overnight on August 23, significant traffic changes will take place around the Bridge of Peace and Tel Aviv HaShalom train station due to extensive upgrade works by Netivei Ayalon, Tel Aviv-Yafo Municipality, and Israel Railways. The northbound exit to Ayalon Highway (Route 20) from the west side (central Tel Aviv) will be completely closed. Additionally, one lane on the bridge heading westbound will be reduced. These restrictions will occur nightly from 10 p.m. to 5 a.m. between August 23 and 26, and continuously from midnight on August 27 until 5 a.m. on August 30.

Despite these closures, Ayalon Highway itself remains open in both directions. Traffic on the Bridge of Peace will continue as usual except for the lane reduction westbound. Drivers approaching from the west are advised to detour east on Derech HaShalom, then turn left onto Yigal Alon toward the Arlozorov Interchange or turn right before the bridge onto Yitzhak Sadeh or HaMasger streets to reconnect with Ayalon North via the La Guardia Interchange.

Public transportation bus lines will operate normally, and pedestrian access across the bridge will remain open and safe, with supervisors present throughout the works. At Tel Aviv HaShalom station, from 8 p.m. on August 25 until August 29, escalator replacements will prevent direct access from the northern hall to platform 1 (northbound trains). Passengers will be redirected via alternative routes with signage and staff assistance.

Makoמרכז · נווה אילן

התחברות ל-baba News

התחברו כדי לעקוב אחרי מערכות, נושאים ואנשים.

או קוד במייל

מוזכרים

פתיחת המבזקים