מבזקים

התחברות ל-baba News

חשבון אחד לאתר, לאייפון ולאנדרואיד — המנוי נשאר איתכם.

או קוד במייל

חיפוש סיפורים

הקלידו לפחות שני תווים. התוצאות מגיעות מכל המערכות ש-baba קורא.

↑↓ למעבר · ↵ לפתיחה · esc לסגירה

התחברות ל-baba News

התחברו כדי להמשיך לשאול. News Plus מסיר את המגבלה היומית.

או קוד במייל

Globesכללי

Temporary Nighttime Traffic Changes at Major Israeli Interchange Due to Bridge Upgrades

תומצת מתוך Globes על ידי baba

עסקיםטון ענייני

עברית · 3 מערכות מסקרות

Due to upgrade works on the Peace Bridge, the main interchange in Israel will have nightly closures of the westbound exit to northbound Ayalon Highway until August 30. Concurrently, Tel Aviv HaShalom railway station will install new escalators, limiting access to platform 1. These improvements prepare for increased traffic and passenger volumes expected by 2030.

הידיעה ב-6 שורות · תקציר של baba

  • Peace Bridge upgrade causes nightly closures of westbound exit to northbound Ayalon until August 30.
  • One westbound lane reduced; left turns to Ayalon northbound prohibited during closures.
  • Ayalon Highway and Peace Bridge remain open in both directions throughout works.
  • Tel Aviv HaShalom station installs new escalators from August 25 to 29, limiting platform 1 access.
  • Upgrades support expected growth to 100 million annual rail passengers by 2030.
  • Drivers advised to follow traffic controllers and adjust to temporary changes.

Temporary traffic changes will affect the country's main interchange, known as the "Great Junction," over the coming nights due to upgrade works on the Peace Bridge. Starting tonight and continuing nightly until Thursday, the exit ramp to the northbound Ayalon Highway from the west will be closed between 10 p.m. and 5 a.m. Additionally, this exit will be fully closed from midnight Thursday until 5 a.m. Sunday, August 30. While one westbound lane will be reduced and left turns onto the northbound Ayalon will be prohibited, the Ayalon Highway itself will remain open in both directions, and travel over the Peace Bridge will continue as usual.

The Israel Railways station at Tel Aviv HaShalom will also undergo upgrades, specifically the installation of new escalators replacing those in service since 1996. These works will take place from the evening of August 25 until August 29, during which passengers will not be able to access platform 1 for northbound trains from the station hall. This upgrade is part of preparations for an expected increase in passenger numbers to approximately 100 million annually by 2030, marking 30 years since the station's opening and its service to around 250 million passengers so far.

Authorities have advised drivers to follow traffic controllers' instructions and adapt to the temporary traffic arrangements. The upgrades aim to improve infrastructure and accommodate future traffic and passenger growth in the Tel Aviv metropolitan area.

Globesאחרים · ראשון לציון

התחברות ל-baba News

התחברו כדי לעקוב אחרי מערכות, נושאים ואנשים.

או קוד במייל

מוזכרים

סיקור מלא · 4 מקורות
ראשון: Globes · אוג׳ 23, 2026

אותו אירוע, כפי שכל מערכת דיווחה עליו בנפרד. פתחו כמה דיווחים כדי להשוות מה כל מערכת מדגישה, ומה היא משאירה בחוץ.

ידיעות קשורות · 2

לא אותו אירוע: ידיעות אחרות שחולקות עם הידיעה הזו אנשים, מקומות או נושא. רקע, תגובות והמשכים.

פתיחת המבזקים