Keren Kayemet LeIsrael Bridge Lanes Closed Temporarily for Repairs in Tel Aviv
Translated & summarized from Ynet by baba
The Keren Kayemet LeIsrael Bridge in Tel Aviv will have lane closures from August 17 to 21 and August 22 to 28 for rehabilitation work, with Ayalon Highway remaining open.
The story in 5 lines · by baba
- West-to-east lanes on KKL Bridge closed from August 17 23:30 to August 21 6:00 for repairs.
- Left turns from Ayalon South exit to the bridge will be blocked during this time.
- Ayalon Highway (Route 20) remains open throughout the work.
- East-to-west lanes on KKL Bridge closed from August 22 23:30 to August 28 6:00.
- Closures are for rehabilitation and safety improvements on the bridge.
Starting tonight at 11:30 PM until August 21 at 6:00 AM, the west-to-east lanes on the Keren Kayemet LeIsrael (KKL) Bridge in Tel Aviv will be closed for traffic due to rehabilitation and safety work. During this period, left turns from the south Ayalon exit onto the bridge will also be prohibited. Despite these closures, the Ayalon Highway (Route 20) will remain open for traffic throughout the work.
Following this, from Saturday, August 22 at 11:30 PM until August 28 at 6:00 AM, the east-to-west lanes on the KKL Bridge will be closed for traffic. These measures are part of ongoing infrastructure maintenance to ensure road safety and functionality.
The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.
Centre 1Right 1
Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.