Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Widespread Power Outages Hit Tel Aviv-Jaffa Amid Peak Summer Heat

By אדר גיציס
Translated & summarized from N12 by baba
The story · English

On August 5, 2026, several areas in Tel Aviv-Jaffa experienced extensive power outages during a heatwave. Residents received notifications indicating the outages were due to a regional fault, with electricity restoration expected only by the afternoon. The issue stems from a malfunction at a local substation, prompting reinforced Electric Company teams to work on repairs.

A Tel Aviv resident, who is pregnant, expressed frustration to N12, calling the situation life-threatening and criticizing the prolonged repair timeline during extreme summer heat. The Electric Company apologized for the inconvenience and assured that crews are actively addressing the fault to restore power as quickly as possible. They estimated about an hour until normal service resumes. Similar outages had also occurred the previous weekend.

The incident highlights ongoing challenges in maintaining reliable electricity supply in Tel Aviv during peak demand periods, with authorities emphasizing their commitment to swift resolution.

Read the original at N12
Full coverage · 3 outlets
100% centerFirst: N12 · Aug 5

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Center 3
Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the live terminal