Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

General12:45 · Aug 3

Contractor Accident Causes 20-Hour Power Outage Amid Heatwave in Central Tel Aviv

Translated & summarized from Maariv by baba
The story · English

A contractor working for the Tel Aviv municipality accidentally damaged power cables on King George Street, causing a nearly 20-hour electricity outage in central Tel Aviv around King George and Bar Giora streets. The outage occurred during a severe summer heatwave, leaving residents without air conditioning and businesses suffering significant losses. The blackout began the night before and only started to be restored gradually around 11 a.m. the following day, with full power resumption by midday.

Residents described the night as unbearable due to the intense heat and humidity, with some forced to stay with relatives or friends. Electric company crews worked continuously through the night to repair the damaged infrastructure. The Israel Electric Corporation confirmed the contractor's responsibility and emphasized their teams' nonstop efforts to restore power, which was partially returned to some customers overnight before full restoration.

The prolonged outage during extreme heat caused distress and financial damage to local businesses, highlighting vulnerabilities in infrastructure maintenance during critical weather conditions. The Israel Electric Corporation and city officials are addressing the incident as investigations continue.

Read the original at Maariv
Open the live terminal