Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

BizportalEconomy

Israel's Skyscraper Developers Struggle to Blend Offices and Apartments

Translated & summarized from Bizportal by baba

BusinessNeutral tone

Hebrew · Sole source

Israeli developers are struggling to create mixed-use skyscrapers that effectively combine residential and office spaces, a common feature in global cities. Significant surpluses in both office and apartment markets, coupled with engineering and legal complexities, make such integrated projects challenging and less profitable than single-purpose towers. While market shifts like increased hybrid work may eventually favor mixed-use development, current obstacles hinder widespread adoption.

The story in 6 lines · by baba

  • Israel faces a significant surplus of office space, estimated at 180 million square meters, far exceeding demand.
  • Developers are hesitant to build mixed-use skyscrapers due to economic, engineering, and legal complexities.
  • The Azrieli Spiral Tower reduced its planned residential units, prioritizing office space for stable rental income.
  • Engineering challenges include complex piping, safe room integration, and separate entrances for mixed-use towers.
  • Legal disputes over shared ownership in mixed-use buildings have led some developers to build separate towers.
  • Market shifts like hybrid work may increase the viability of residential units in future mixed-use developments.

Despite the global trend of mixed-use skyscrapers, Israel lags in integrating residential and office spaces within the same towers. While a 91-square-meter, three-room apartment on the 58th floor of the Moshe Aviv Tower in Ramat Gan sold for 3.1 million shekels, the building primarily features 57 office floors and only 12 residential ones. This imbalance persists despite a market need for such mixed developments. A significant surplus of approved office and commercial space, estimated at 180 million square meters, far exceeds projected demand for decades, with absorption expected to take at least five years. Simultaneously, Tel Aviv faces a surplus of approximately 10,000 unsold new apartments, mostly at high prices, indicating that converting offices to residences isn't a simple solution and depends heavily on location, unit size, and price.

While legislation in 2022 allows for office-to-residential conversions, major developers continue to build single-purpose towers. The Azrieli Spiral Tower, a 91-story project costing an estimated 3.3 billion shekels and due for completion in 2028, exemplifies this. Although initially planned with 292 residential units, the number was reduced to 171, with the tower focusing on approximately 85,000 square meters of office space, making residences a secondary component. This decision reflects the preference for rental income from offices, which provide stable, long-term cash flow from institutional tenants, compared to the more complex management and one-time sales or shorter-term rentals of apartments.

Beyond economic considerations, significant engineering challenges hinder mixed-use construction. Residential units require extensive wet piping for kitchens and bathrooms in each unit, a complex addition to office buildings where piping is centralized. Integrating safe rooms (mamad), accommodating different window requirements, and separating entrances and elevators for residents and office workers add substantial costs and complexity. Safety systems, fire suppression, and evacuation routes also differ significantly for buildings where people sleep versus those where they only work.

Legal complexities also arise, particularly concerning shared ownership in a condominium where office owners and apartment owners have differing interests in maintenance, renovations, and common area usage. Disputes over these issues have led to litigation, such as the Uptown Tower case in Bat Yam. Consequently, some developers opt for separate towers, like Elite Tower, or exclusively office buildings, such as ToHa 2 in Tel Aviv, as single-use buildings are easier to manage, finance, and value based on rental income.

Despite these obstacles, signs of change are emerging. The decline in office demand due to hybrid work models, coupled with rising apartment prices, is making upper residential floors more economically viable. The evolving office market necessitates a reevaluation of development strategies, but the question remains whether regulatory and engineering hurdles can be overcome before the office surplus becomes a structural problem.

BizportalOther · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

EconomyTopic

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire