מבזקים

התחברות ל-baba News

חשבון אחד לאתר, לאייפון ולאנדרואיד — המנוי נשאר איתכם.

או קוד במייל

חיפוש סיפורים

הקלידו לפחות שני תווים. התוצאות מגיעות מכל המערכות ש-baba קורא.

↑↓ למעבר · ↵ לפתיחה · esc לסגירה

התחברות ל-baba News

התחברו כדי להמשיך לשאול. News Plus מסיר את המגבלה היומית.

או קוד במייל

N12כללי

Tel Aviv's KKL Bridge Closes for Two Weeks of Major Safety Repairs

תומצת מתוך N12 על ידי baba

מרכז

עברית · 6 מערכות מסקרות

Tel Aviv's KKL Bridge will close for two weeks starting August 15 for major safety and maintenance work, causing significant traffic disruptions and public transport changes. The closure will occur in two phases, first blocking west-to-east traffic, then east-to-west. Authorities urge drivers to use alternative routes and provide updated transit information.

הידיעה ב-6 שורות · תקציר של baba

  • KKL Bridge in Tel Aviv closes for two weeks from August 15 for safety repairs.
  • West-to-east traffic blocked first, then east-to-west from August 22.
  • Ayalon Highway lanes remain open despite bridge closures.
  • Significant traffic congestion expected; drivers advised to use alternative routes.
  • Public transport routes and stops near the bridge will be modified.
  • Work coordinated by Ministry of Transport, Tel Aviv Municipality, and Israel Police.
Tel Aviv's KKL Bridge Closes for Two Weeks of Major Safety Repairs
איור מערכת שנוצר על ידי baba News, לא צילום של האירוע.

Starting the night of Saturday, August 15, the KKL Bridge in Tel Aviv will be closed to traffic for two weeks to undergo extensive maintenance and safety upgrades. The closure is organized by the Ministry of Transport and Tel Aviv Municipality through Netivei Ayalon and will be implemented in two main phases.

The first phase runs from 11:30 p.m. on August 15 until 6:00 a.m. on August 21, during which west-to-east traffic on the bridge will be blocked to allow for joint and structural repairs. Drivers from Ayalon South will not be able to turn left onto the bridge but can turn right onto KKL Boulevard as usual. Access to Highway 20 southbound from the KKL interchange remains open. Pedestrian access will be maintained on the northern side of the bridge.

The second phase begins at 11:30 p.m. on August 22 and continues until 6:00 a.m. on August 28, when east-to-west traffic will be blocked. Detailed traffic arrangements for this phase will be announced closer to the date. Throughout the work, Ayalon Highway lanes will remain open, but significant traffic congestion is expected in the area.

Public transportation routes and stops near the bridge will also be adjusted during the repairs. Traffic supervisors and the Israel Police will coordinate to manage the changes. Netivei Ayalon advises drivers to use alternative routes and navigation apps like Waze. For full public transport details, commuters can contact the "Kol Kav" hotline at *8787.

These essential safety works aim to ensure the bridge's long-term structural integrity and public safety.

N12מרכז · נווה אילן

התחברות ל-baba News

התחברו כדי לעקוב אחרי מערכות, נושאים ואנשים.

או קוד במייל

מוזכרים

פתיחת המבזקים