מבזקים

התחברות ל-baba News

חשבון אחד לאתר, לאייפון ולאנדרואיד — המנוי נשאר איתכם.

או קוד במייל

חיפוש סיפורים

הקלידו לפחות שני תווים. התוצאות מגיעות מכל המערכות ש-baba קורא.

↑↓ למעבר · ↵ לפתיחה · esc לסגירה

התחברות ל-baba News

התחברו כדי להמשיך לשאול. News Plus מסיר את המגבלה היומית.

או קוד במייל

Ynetכללי

Two Weeks of Major Traffic Closures Planned on KKL Bridge in North Tel Aviv

תומצת מתוך Ynet על ידי baba

מרכז

עברית · 6 מערכות מסקרות

Netivei Ayalon will close lanes on the KKL Bridge in northern Tel Aviv for two weeks starting August 15 for safety upgrades, causing heavy traffic and public transport changes.

הידיעה ב-6 שורות · תקציר של baba

  • Netivei Ayalon will close KKL Bridge lanes in north Tel Aviv for two weeks starting August 15.
  • First phase closes west-to-east lanes and restricts left turns from Ayalon South exit.
  • Second phase closes lanes in the opposite direction from August 22 to 28.
  • Ayalon highways remain open throughout the rehabilitation work.
  • Traffic apps like Waze are updated and public transport routes will change during closures.
  • Work is coordinated with Israel Police and aims to finish ahead of schedule.
Two Weeks of Major Traffic Closures Planned on KKL Bridge in North Tel Aviv
איור מערכת שנוצר על ידי baba News, לא צילום של האירוע.

Netivei Ayalon has announced a two-week series of traffic closures on the KKL Bridge in northern Tel Aviv as part of essential safety and rehabilitation work. The closures will begin on Saturday night, August 15, at 23:30 and continue through Friday morning, August 22, at 06:00 for the first phase. The second phase will start immediately after, from Saturday night, August 22, at 23:30 until Friday morning, August 28, at 06:00.

During the first phase, west-to-east lanes on the bridge will be closed, and left turns from Ayalon South exit will be prohibited. In the second phase, the closures will affect the opposite direction. Despite these restrictions, the Ayalon highways themselves will remain open throughout the work. The timing was chosen because late August is typically the quietest period for traffic in the affected areas.

Netivei Ayalon emphasized that the work is coordinated with the Israel Police and supervised by traffic inspectors. Changes to public transportation routes and station locations will also be implemented during this period. Navigation apps like Waze have been updated to reflect the closures. The Ministry of Transport and Tel Aviv-Yafo Municipality are jointly promoting these necessary safety upgrades, with efforts underway to complete the work ahead of schedule. For further information, the public can contact the "Kol Kav" hotline at *8787.

Ynetמרכז · ראשון לציון

התחברות ל-baba News

התחברו כדי לעקוב אחרי מערכות, נושאים ואנשים.

או קוד במייל

מוזכרים

סיקור מלא · 7 מקורות
ראשון: Now 14 · אוג׳ 12, 2026

אותו אירוע, כפי שכל מערכת דיווחה עליו בנפרד. פתחו כמה דיווחים כדי להשוות מה כל מערכת מדגישה, ומה היא משאירה בחוץ.

ידיעות קשורות · 4

לא אותו אירוע: ידיעות אחרות שחולקות עם הידיעה הזו אנשים, מקומות או נושא. רקע, תגובות והמשכים.

פתיחת המבזקים