Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

BEYOND Tower in Givatayim Receives Fire Safety Approval Ahead of Occupancy

By מערכת Business
Translated & summarized from N12 by baba
The story · English

The BEYOND office tower project in Givatayim, promoted by Tadiran Group, Union, and Himanta, has received final fire safety and emergency approval. The tower, standing approximately 320 meters tall with 78 floors, is set to become Israel's tallest skyscraper. Designed to accommodate around 10,000 people daily, the building includes a dedicated evacuation system for emergencies.

The approval followed an extensive drill testing the tower's emergency systems, fire safety measures, and evacuation capabilities. Oren Shishitzki, Commander of the Dan District Fire and Rescue Services, emphasized the complexity of ensuring safety in a building of this height and occupancy, noting the need for advanced preparedness for all scenarios.

Gili Geva, Chairman of Tadiran Group, described BEYOND as a groundbreaking project in Israel, highlighting its engineering and operational complexity. He stated that the fire approval reflects the high standards and significant investment in planning and safety systems, achieved through exceptional cooperation with fire service representatives throughout the planning and construction phases.

Read the original at N12
Full coverage · 3 outlets
100% centerFirst: N12 · Aug 10

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Center 3
Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Ask About This Article

Duki reads it, and every newsroom on the same story, then answers with sources.

Open the live terminal