Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

CursorinfoGeneral

Ben Gurion Airport Undergoing Major Renovation to Improve Passenger Experience

Translated & summarized from Cursorinfo by baba

CommunityNeutral tone

Russian · 2 newsrooms covering

Ben Gurion Airport is undergoing a NIS 310 million reconstruction of Terminal 3 to improve passenger flow and reduce wait times. The project includes a new "Tel Aviv Gate" for bus arrivals, additional security and border control points, and expanded dining areas. The modernization aims to enhance convenience and efficiency, with further expansion planned by 2027.

The story in 5 lines · by baba

  • Ben Gurion Airport's Terminal 3 is undergoing a NIS 310 million reconstruction project.
  • A new "Tel Aviv Gate" will expedite passenger journeys from buses to baggage claim.
  • Seven new security checkpoints and 15 border control points will be added.
  • The project aims to reduce passenger travel time and ease airport congestion.
  • The current phase is expected to take 30 months, with further expansion planned by 2027.

Ben Gurion Airport's Terminal 3 is undergoing a significant reconstruction project, aiming to streamline passenger journeys and address common airport frustrations. The NIS 310 million modernization effort will shorten the path from aircraft to baggage claim, enhance passport control and security screening, and expand waiting areas. In the coming years, the airport will also see new facilities and additional infrastructure.

Recently, a key phase of the "Tel Aviv Gate" complex construction was completed in the western part of Terminal 3. This new section will feature a dedicated route for passengers arriving by bus from aircraft parked at remote stands. Previously, these passengers faced a lengthy walk through the terminal. The "Tel Aviv Gate" aims to provide a quicker entry, expedited passport control, and direct access to baggage claim, thereby reducing travel time within the airport and easing congestion.

The "Tel Aviv Gate" is part of a larger initiative by the Israel Airports Authority, with Oron Infrastructure and Construction Group building a four-story, 7,000-square-meter extension. Departing passengers will also benefit from seven additional security checkpoints and 15 new border control points, intended to boost throughput and reduce queues during peak times. The catering areas will be expanded, adding approximately 450 seats.

Conducting construction without disrupting airport operations presents a major challenge, requiring close coordination with security, ground staff, and airlines. Shaul Zuck, General Director of Oron Infrastructure and Construction, stated that the project's primary goal is not just increasing space but making passenger movement more convenient and procedural times shorter. The modernization will continue beyond this phase, with plans to expand Terminal 3 eastward and build a fifth wing by 2027. The current project is expected to take about 30 months to complete, after which the airport will have new routes for arriving passengers, more control points, and expanded service areas to accommodate future growth.

CursorinfoOther · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 2 outlets
First: Cursorinfo · 2h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Open the Wire