Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

IceSecurity

Signal System Failure Causes Delays on Israel Railways Southbound Lines

Translated & summarized from Ice by baba

BusinessNeutral tone

Hebrew · 5 newsrooms covering

A signaling system failure near Kiryat Malakhi caused train delays on Israel Railways' southbound line to Be'er Sheva on Wednesday morning. Teams are working to fix the issue, with apologies issued to passengers. Separately, infrastructure work in Ashdod on Friday will cause service changes and require shuttle buses, with full service resuming Saturday evening.

The story in 6 lines · by baba

  • A signaling system failure near Kiryat Malakhi disrupted Israel Railways services on Wednesday.
  • Delays affected trains on the line heading towards Be'er Sheva.
  • Israel Railways teams are working to repair the fault and restore normal operations.
  • Upcoming infrastructure work in Ashdod on Friday will alter train schedules.
  • Complimentary shuttle services will be provided during the Friday work.
  • Full train service is expected to resume by Saturday evening.
Signal System Failure Causes Delays on Israel Railways Southbound Lines
Editorial illustration generated by baba News, not a photograph of the event.

Israel Railways experienced significant travel disruptions on Wednesday morning due to a malfunction in the signaling system near Kiryat Malakhi. The technical issue led to delays on the train line heading towards Be'er Sheva, impacting services up to that city. The western line to Be'er Sheva, however, remained operational, serving stations like Sderot and Netivot.

Israel Railways stated that its teams were on-site working to repair the fault and restore normal service. The company issued an apology to passengers for the inconvenience caused by the disruption.

Separately, Israel Railways announced upcoming infrastructure work in the Ashdod area scheduled for Friday, October 23rd. This work is described as vital for passenger safety and service improvement. During this period, train services on the Be'er Sheva-Herzliya line will be split, operating between Be'er Sheva Central and Ashkelon, and between Yavne West and Herzliya. Additionally, trains on the Ashkelon-Binyamina line will terminate and originate at Rehovot station.

To mitigate the impact of the Friday work, Israel Railways will provide complimentary shuttle services. Full service is expected to resume by Saturday evening. The article also mentions special train services, numbers 687 and 8299, which will terminate at Yavne West/Rehovot on Thursday, October 22nd, for the "Next" music festival at Ramat Gan Stadium, featuring artists like Omer Adam and Rita.

IceOther · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 6 outlets
First: Ynet · 16h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Related stories · 1

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the Wire