Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Ongoing Story· Day 2

Tel Aviv Building Under Renovation Collapses; No Injuries Reported

13 developments

HaaretzGeneral

Tel Aviv Building That Collapsed Was Cleared by Engineer Two Years Ago

Translated & summarized from Haaretz by baba

Center-leftNeutral tone

Hebrew · 19 newsrooms covering

An unoccupied two-story building in Tel Aviv collapsed this morning, with no reported injuries. The building at 63 Nachalat Binyamin Street had recently begun a Tama 38 reinforcement and expansion project. Despite undergoing repairs and passing an engineer's inspection in 2024, the structure gave way.

The story in 5 lines · by baba

  • An unoccupied building in Tel Aviv collapsed early this morning.
  • No injuries have been reported from the collapse.
  • The building was undergoing a Tama 38 reinforcement and expansion project.
  • The building had been inspected by an engineer in 2024 and found to be sound.
  • The developer was Shlomi Tahon Huri Investments.
Tel Aviv Building That Collapsed Was Cleared by Engineer Two Years Ago
Editorial illustration generated by baba News, not a photograph of the event.

An old, two-story building at 63 Nachalat Binyamin Street in Tel Aviv collapsed early this morning. The building, which contained five apartments and two ground-floor shops, was unoccupied at the time of the collapse. No injuries have been reported.

In May, the building received a permit for a Tama 38/1 reinforcement and expansion project, which involves adding five new apartments over two and a half floors. Construction work had begun in recent weeks. The development company, Shlomi Tahon Huri Investments, was slated to add the new apartments while preserving the existing shops.

According to reports, the building had previously undergone repairs and was inspected by an engineer in 2024, who found it to be sound.

HaaretzLeft · Tel Aviv

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 20 outlets
First: Hamal · Oct 14

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the Wire