Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Now 14Politics

UAE Permanent Embassy Approved for Construction in Herzliya Pituah

Translated & summarized from Now 14 by baba

RightNeutral tone

Hebrew · 9 newsrooms covering

Israel's District Planning and Building Commission approved the construction of the United Arab Emirates' permanent embassy in Herzliya Pituah. The new building, planned for Sapir Street 9, will be up to 15 stories high and is a result of the Abraham Accords. The embassy currently operates from temporary locations, and the new structure aims to deepen bilateral relations. The project includes residential space for diplomats and enhanced public infrastructure.

The story in 6 lines · by baba

  • The District Planning and Building Commission approved the construction of the UAE's permanent embassy in Herzliya Pituah.
  • The new embassy building will be located at Sapir Street 9 and will be up to 15 stories high.
  • The project is a continuation of the Abraham Accords, which normalized relations between Israel and the UAE in 2020.
  • The embassy currently operates from temporary offices in Tel Aviv and Herzliya.
  • The plan includes residential quarters for the ambassador and diplomatic staff.
  • The Herzliya municipality will receive an alternative land plot in exchange for the embassy's location.
UAE Permanent Embassy Approved for Construction in Herzliya Pituah
Editorial illustration generated by baba News, not a photograph of the event.

Israel's District Planning and Building Commission has approved the plan to construct the permanent building for the United Arab Emirates' embassy in Herzliya Pituah. The decision marks a significant step in deepening relations between the two nations following the Abraham Accords, signed in 2020. The new embassy will be located at Sapir Street 9 in the Herzliya Pituah industrial zone. Currently, the UAE embassy operates from temporary offices in Tel Aviv and Herzliya. The approved plan outlines a building up to 15 stories high, with approximately 15,000 square meters of construction area, on a 2.5-dunam plot owned by the Herzliya municipality. Up to 20% of the building's space will be allocated for the ambassador's residence and diplomatic staff quarters on the upper floors. The project also includes provisions for a separate entrance to an underground parking lot, widening Sapir Street, and creating a public space with trees and improved pedestrian infrastructure. The land transfer process is underway, involving the Israel Land Authority and the Herzliya municipality, with the municipality receiving an alternative plot in the Marina area in exchange. Erez Ben Eliezer, District Planner of Tel Aviv, stated that the plan is important for Herzliya, the Tel Aviv district, and Israel, noting that the embassy's proximity to business and high-tech centers will foster international ties and future collaborations.

Now 14Right · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire