Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

0404General

Tiberias Road Closure for Six Months Due to Infrastructure Work

Translated & summarized from 0404 by baba

RightNeutral tone

Hebrew · 1 newsroom

Road 348 in Tiberias will be closed for six months starting October 5, 2026, for infrastructure and safety work by Netivei Israel to stabilize slopes. Alternative routes and traffic guidance will be provided.

The story in 5 lines · by baba

  • Road 348 in Tiberias to close for six months.
  • Closure begins October 5, 2026, at 9 PM.
  • Work involves slope stabilization and road safety.
  • Netivei Israel is conducting the infrastructure project.
  • Alternative routes and traffic guidance will be available.

Tiberias Municipality has informed residents that Road 348, also known as Ariel Sharon Boulevard, will be closed to traffic in both directions starting Monday, October 5, 2026, at 9:00 PM. The closure is expected to last for approximately six months and is necessary for significant infrastructure and safety work being carried out by Netivei Israel. The project aims to stabilize the slopes and prevent road movement. During the closure, drivers are advised to use alternative routes. Traffic directors and signage will be in place during peak hours to guide motorists.

0404Right · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Related stories · 1

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the Wire