Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

MakoWorld

Israel Opens Second Phase of Rapid Transit Lanes and Park-and-Ride Facility

Translated & summarized from Mako by baba

CenterNeutral tone

Hebrew · 3 newsrooms covering

Israel has launched the second phase of its rapid transit lanes project, including a new 15km lane on Ayalon Highway and a 3,500-space park-and-ride facility in Rishon LeZion. The project aims to offer an alternative to private cars, but faces criticism over public transport accessibility.

The story in 5 lines · by baba

  • A new 15km rapid transit lane and park-and-ride facility opened in Rishon LeZion.
  • The facility offers 3,500 free parking spots and shuttle services to Tel Aviv.
  • The project cost 8 billion shekels and is planned for 15 years of operation.
  • Private cars with 3+ passengers may use the lane by 2027.
  • Critics question the project's effectiveness due to limited public transport access.
Israel Opens Second Phase of Rapid Transit Lanes and Park-and-Ride Facility
Editorial illustration generated by baba News, not a photograph of the event.

Israel's Ministry of Transportation and Ayalon Highways have opened the second phase of the rapid transit lanes project, featuring a new park-and-ride complex in western Rishon LeZion and a 15-kilometer rapid lane on Ayalon Highway.

The new complex offers approximately 3,500 free parking spaces, 350 charging stations for electric vehicles, and 500 bicycle parking spots. From this facility, four dedicated shuttle lines provide free transport to major employment centers in Tel Aviv, including the Kirya, Azrieli, the Stock Exchange area, and Savidor. These shuttles run every 5 minutes during peak hours and every 15 minutes at other times, from 6:00 AM to 10:45 PM, Sunday through Thursday.

The rapid lane itself extends 15 kilometers along Ayalon Highway, connecting Rishon LeZion to the Savidor train station in Tel Aviv. The project, which cost approximately 8 billion shekels and includes operation for the next 15 years, is planned to open to private vehicles carrying three or more passengers by 2027.

While the Ministry of Transportation promotes the project as a genuine alternative to private car use, critics argue that the lack of public transportation access to the park-and-ride facility undermines its effectiveness. Transportation experts warn that the new lanes and parking areas might attract more drivers, potentially worsening traffic congestion instead of alleviating it. The first phase of the project, a park-and-ride facility in Shfayim with about 7,000 parking spaces, opened six months ago. According to ministry data, around 10,000 passengers daily use the existing facility, leaving their cars and taking shuttles to Tel Aviv.

MakoCentre · Neve Ilan

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

WorldTopic

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 3 outlets
First: Israel Hayom · Oct 4

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Related stories · 1

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the Wire