Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Economy· Updated

Eshkol Power Station Unit Idles Due to Unforeseen Damage

A 360 MW power unit at the Eshkol plant in Ashdod has been offline since October due to a faulty generator seal discovered during maintenance. The outage, which could have led to a serious accident, is costing Dalia Energy tens of millions of shekels.

2 newsrooms · 2 languages · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

Eshkol Power Station Unit Idles Due to Unforeseen Damage
Illustration by baba

What happened

  1. 01One 360 MW unit at Ashdod's Eshkol power station has been offline since October due to damage.
  2. 02The damage, a faulty generator engine seal, was found during routine maintenance.
  3. 03The outage is costing Dalia Energy tens of millions of shekels in repairs and lost revenue.
  4. 04Dalia Energy acquired the Eshkol plant for a record 9 billion shekels from the IEC.
  5. 05The company stated the incident is not significant and will not cause electricity shortages.

The company deems the incident not significant and expects no electricity shortages, especially during the winter off-peak season.

Translated and summarized by baba from NEWSru Israel, the latest report. Read NEWSru Israel’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • HarediNone
  • ArabNone
  • Other2

How it broke

See which of the 2 newsrooms broke it, and who waited