Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Economy· Updated

Storage Drop Stock Plummets 98% Amid Project Halt and Financial Woes

The stock of energy firm Storage Drop, previously led by politician Gadi Eisenkot, has crashed by over 98%, from 260 million shekels to 4 million. The company halted its flagship project with Tnuva due to infrastructure issues, facing significant financial losses and a "going concern" warning from auditors.

2 newsrooms · 1 language · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

What happened

  1. 01Storage Drop stock value has collapsed by over 98%, from 260 million to 4 million shekels.
  2. 02The company halted its flagship air compression project with Tnuva due to infrastructure deficiencies.
  3. 03Storage Drop faces severe financial difficulties, with significant losses and low cash reserves.
  4. 04Auditors issued a "going concern" warning regarding the company's ability to continue operations.
  5. 05Gadi Eisenkot chaired Storage Drop before entering politics in late 2022.

Storage Drop is also developing a separate cooling system with EU funding, but it is not yet generating revenue.

Translated and summarized by baba from Ice, the latest report. Read Ice’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • HarediNone
  • ArabNone
  • Other2

How it broke

See which of the 2 newsrooms broke it, and who waited