Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Economy· Updated

Israel's Most Important Power Station Project Secures $1.5 Billion in Financing

Adaletec Group and Menora Mivtachim, with Keystone Power, have secured financing for the 5.6 billion shekel Sorek power station project, a critical infrastructure development for Israel.

2 newsrooms · 1 language · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

What happened

  1. 01Sorek power station project, costing 5.6 billion shekels, has secured its financing.
  2. 02The project is a critical development for Israel's electricity sector.
  3. 03Financing was led by Mizrahi-Tefahot Bank and Discount Bank.
  4. 04The station is scheduled to begin operations in November 2029.
  5. 05It will have a maximum production capacity of approximately 850 megawatts.
  6. 06The primary energy source will be natural gas.

The project, expected to be operational by November 2029, will have a capacity of 850 megawatts and utilize advanced Siemens technology. The financing was led by Mizrahi-Tefahot Bank and Discount Bank. The station will primarily run on natural gas, with a major supply agreement in place.

Translated and summarized by baba from Ice, the latest report. Read Ice’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • HarediNone
  • ArabNone
  • Other2

How it broke

See which of the 2 newsrooms broke it, and who waited