Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Security· Updated

Tel Aviv Building Collapse Sparks Outrage Over Safety Failures

A three-story building undergoing renovation partially collapsed on Wednesday morning on Nachalat Binyamin Street in Tel Aviv, near the corner of Rothschild Boulevard. Emergency services, including police, firefighters, and Magen David Adom, rushed to the scene after receiving reports around 9:40 AM. No injuries were reported, and five workers who were inside the structure managed to escape unharmed before the collapse.

15 newsrooms · 3 languages · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

Tel Aviv Building Collapse Sparks Outrage Over Safety Failures
Illustration by baba

What happened

  1. 01A three-story building undergoing renovation partially collapsed on Nachalat Binyamin Street in Tel Aviv on Wednesday morning.
  2. 02Five workers who were inside the building managed to escape unharmed before the structure fell, and no injuries were reported.
  3. 03Emergency services and IDF Home Front Command troops searched the debris and worked to stabilize the remaining structure.
  4. 04The Ministry of Labor stated the site was operating illegally without reporting to the Safety Administration or appointing a site manager.
  5. 05The building had been declared dangerous in 2023 but was removed from the list in February 2024 after repairs.
  6. 06Residents of three adjacent buildings were evacuated as a precaution, and several nearby roads were closed to traffic.
  7. 07Preliminary investigations suggest the collapse was caused by a technical failure in the building's support structure.

Rescue teams, alongside IDF Home Front Command troops, searched the debris to ensure no one was trapped and worked to stabilize the remaining structure. The building was unoccupied and slated for demolition as part of a TAMA 38/1 renovation project. As a precaution, authorities evacuated residents from three adjacent buildings and closed several nearby roads to traffic.

According to the Ministry of Labor, the construction site was operating illegally without reporting to the Safety Administration and without a required site manager, leading to a prolonged closure order. The building had previously been declared dangerous in 2023 but was removed from the list in February 2024 after repairs. Preliminary findings suggest the collapse was caused by a technical failure in the building's support structure, with concerns also raised regarding potential asbestos exposure at the site.

Summarized by baba from the reports of 12 newsrooms. Updated

Latest report: Maariv. Read Maariv’s original

The coverage

15 newsrooms on this story

Who covered it

  • Left1
  • Centre8+3
  • Right3
  • HarediNone
  • ArabNone
  • Other3

How it broke

See which of the 15 newsrooms broke it, and who waited

How the headlines differ

MaarivCentre · the lead report

Tel Aviv Building Collapse Sparks Outrage Over Safety Failures

11 more newsrooms worded it differently