Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Full coverage· Politics· Updated

Israel to Cap New Data Center Power at 200 Megawatts

Israel's Electricity Authority plans to limit new data centers to 200 megawatts each, a move aimed at protecting the national power grid and allowing for more facilities. This comes as data centers are projected to consume 20% of the country's electricity by 2030.

2 newsrooms · 2 languages · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

What happened

  1. 01Israel's Electricity Authority will cap new data centers at 200 megawatts each.
  2. 02Data centers are projected to consume 20% of Israel's electricity by 2030.
  3. 03The new limit would block planned facilities of 1100 and 875 megawatts.
  4. 04The cap aims to protect the national grid from instability and outages.
  5. 05Total requested data center capacity exceeds current generation capacity.

The proposed cap would disallow several large-scale projects already in the pipeline, including one planned at 1100 megawatts. The authority aims to prevent grid instability and widespread outages, as data center demand is constant and cannot be easily curtailed.

Translated and summarized by baba from NEWSru Israel, the latest report. Read NEWSru Israel’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • HarediNone
  • ArabNone
  • Other2

How it broke

See which of the 2 newsrooms broke it, and who waited