Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

News Plus

Welcome, one more step

The cross-newsroom layer: who covered a story, who didn’t, and how each one worded it. Plus your own news, on every device.

Follow your news

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories
  • The daily brief by email

See the coverage

  • Headlines side by side
  • Who reported first
  • Every newsroom clip, from every platform
  • Every newsroom photo on a story

Go deeper

  • The whole archive
  • Your reading diet
  • Duki without the daily limit
  • The Desk: the news, spoken every hour
  • Catch Me Up, and what changed since you read it
  • The Wire

Free stays free: the live wire, Not Everywhere, the brief, five follows and five Duki questions a day.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

News Plus · Ask Duki

Keep asking Duki

A free account gets five questions a day. News Plus lifts the daily limit.

Also in News Plus

  • The whole archive
  • Headlines side by side
  • Who reported first
  • The Desk, every hour

Full coverage· Economy· Updated

Haifa Port Freight Train Service Halted for 6 Weeks Amid Repair Dispute

Freight train services at Haifa Port have been suspended for six weeks due to a track defect and a dispute between the port authority and Israel Railways over repair responsibility. The halt has shifted cargo to trucks, doubling costs and increasing road congestion.

2 newsrooms · 2 languages · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

What happened

  1. 01Haifa Port's freight train service has been stopped for six weeks due to a track defect.
  2. 02A dispute between the port authority and Israel Railways over repair responsibility is causing the delay.
  3. 03Shifting cargo to trucks has doubled container transport costs and increased road congestion.
  4. 04Repairing the track is estimated to cost 2.8 million shekels and take up to four weeks.
  5. 05The Ministry of Transport is working to find a solution to resume services quickly.

The estimated repair cost is 2.8 million shekels, with repairs taking up to four weeks. Both the port and the Ministry of Transport are seeking a swift resolution to resume services.

Translated and summarized by baba from Al-Shams, the latest report. Read Al-Shams’s original

The coverage

2 newsrooms on this story

Who covered it

  • LeftNone
  • CentreNone
  • RightNone
  • HarediNone
  • Arab1
  • Other1

How it broke

Plus

News Plus · Who reported first

See which newsroom broke it

The order the newsrooms filed in, and how long each side of the press waited before running the story.

Also in News Plus

  • Headlines side by side
  • Story alerts
  • The Wire
  • Unlimited follows