Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

MaarivEconomy

Dimona Reconstruction Project to Build 274 New Sheltered Apartments

Translated & summarized from Maariv by baba

CenterNeutral tone

Hebrew · 2 newsrooms covering

Dimona's Yosseftal complex, damaged in the war, will be rebuilt with 274 new protected apartments in a NIS 330 million urban renewal project led by Amidar. Residents can choose between a new, upgraded apartment or a financial buyout. The project, facing economic viability challenges, secured NIS 75 million in public funding and aims to create a modern, safe living environment.

The story in 5 lines · by baba

  • Dimona's Yosseftal complex will be rebuilt with 274 new protected apartments.
  • The urban renewal project involves an investment of approximately NIS 330 million.
  • Residents can choose between a new apartment or a financial buyout.
  • The project secured NIS 75 million in public funding from government ministries.
  • Amidar was chosen to lead the reconstruction of the war-damaged complex.
Dimona Reconstruction Project to Build 274 New Sheltered Apartments
Editorial illustration generated by baba News, not a photograph of the event.

Dimona is set to undergo a significant urban renewal project in the Yosseftal complex, which was damaged during the war. The project, led by Amidar, will involve the construction of approximately 274 new, protected apartments, with an investment of around NIS 330 million. This initiative aims to transform the damaged area into a modern, safe, and secure residential environment.

The Ministry of Construction and Housing announced that the required majority of rights holders in the complex have agreed to the project, and Amidar has applied to be recognized as the developer for the renewal. A key challenge was the economic viability of the project in a peripheral area with low land values. To address this, the Urban Renewal Authority, in cooperation with the Ministry of Finance and the Ministry of Construction and Housing, secured the necessary budgets to make the project feasible.

The project received approval this week from the Ministry of Construction and Housing's Projects Committee. Public funding of approximately NIS 75 million will be allocated, including NIS 53 million from the Government Urban Renewal Authority and NIS 22 million from the Ministry of Construction and Housing. The total investment is estimated at NIS 330 million.

Residents of the complex were offered two options: to receive a new apartment equipped with a protected room (Mamad), additional space, and a sun balcony, along with funding for alternative housing and guarantees during construction, or to accept a financial buyout based on a government appraiser's valuation. So far, 20 apartment owners have chosen the financial compensation option.

Dimona Mayor Beni Biton called the project "historic news" for the city, emphasizing the creation of a new, safe, and high-quality living space. He thanked the involved ministries and Amidar for their partnership and swift commitment to the residents.

Keep up with

MaarivCentre · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

EconomyTopic

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 2 outlets
First: NEWSru Israel · 8h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Open the Wire