Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Ongoing Story· Day 73

Israel Railways Adjusts Schedules for Rosh Hashanah and Selichot

3 developments

KipaGeneral

Train Service Disruptions Expected Due to Infrastructure Upgrades

Translated & summarized from Kipa by baba

Religious-rightNeutral tone

Hebrew · 5 newsrooms covering

Israel Railways is implementing major service changes on November 26-29 due to infrastructure and signaling system upgrades. Key stations will close, and several lines will operate in split formats or have altered endpoints. Free shuttle services will be provided, and normal operations are expected to resume by early Sunday, November 29. Passengers are urged to check for updates before traveling.

The story in 5 lines · by baba

  • Train service disruptions will occur November 26-29 due to infrastructure and signaling upgrades.
  • Stations Kfar Chabad and Lod Ganei Aviv will temporarily close during the work.
  • Several train lines will operate in split formats with altered end stations.
  • Free shuttle services will be provided to assist affected passengers.
  • Normal train operations are expected to resume by early Sunday, November 29.
Train Service Disruptions Expected Due to Infrastructure Upgrades
Editorial illustration generated by baba News, not a photograph of the event.

Israel Railways will implement significant changes to train services on Thursday and Friday, November 26-27, affecting the central and Shephelah regions, and again on Saturday evening, November 28, nationwide. These disruptions are due to infrastructure work and the upgrade of the signaling system. Stations Kfar Chabad and Lod Ganei Aviv will be temporarily closed. Services on the Beersheba-Nahariya/Carmiel and Ashkelon-Binyamina lines will operate in a split format, with altered end and transfer stations. The Beit Shemesh-Herzliya line will also see changes: on Thursday, trains will only run between Beit Shemesh and Lod, and on Friday, it will operate in a split format. To assist passengers, Israel Railways will provide free shuttle services and a dedicated train line between Lod and Tel Aviv Savidor Center, with stops at HaHagana and HaShalom stations, running twice per hour in each direction. The Western Negev line will continue normal operations, and regular bus routes will be reinforced.

Further extensive changes are scheduled for Saturday evening, November 28, as part of the preparation for the new ETCS signaling system. Trains from the south will terminate at Lod station, while trains from the north will end at Netanya. The Jerusalem Yitzhak Navon-Hadera line will not operate. The Nahariya-Modi'in line will run only to Netanya, and trains on the Beersheba-Herzliya line, passing through Ofakim, Netivot, and Sderot, will terminate at Rishon LeZion Moshe Dayan. Israel Railways emphasizes that the work aims to improve travel safety and enable the new signaling system, which will also increase train frequency in Jerusalem and across the country. Normal train service is expected to resume by approximately 1:00 AM on Sunday, November 29. Passengers are advised to check the Israel Railways website, app, service hotline *5770, or official WhatsApp channel for updates before traveling.

KipaRight · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Open the Wire