Get Plus

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

SrugimSecurity

Samaria Road Expansion Project Accelerated to Boost Regional Connectivity

Translated & summarized from Srugim by baba

Religious-rightNeutral tone

Hebrew · 2 newsrooms covering

The Head of the Samaria Regional Council, Yossi Dagan, announced the acceleration of a NIS 500 million project to widen Highway 505 between Ariel and Tapuah junctions. The expansion aims to create a 100 km dual carriageway connecting central Israel to the Jordan Valley, facilitating faster travel and supporting regional growth. Dagan linked the infrastructure development to his goal of increasing Samaria's population to one million residents.

The story in 5 lines · by baba

  • Highway 505 in Samaria is being widened in a NIS 500 million project to improve regional transport.
  • The expansion will create a 100 km dual carriageway connecting central Israel to the Jordan Valley.
  • The project aims to enable continuous travel at 100 km/h and support a population of one million in Samaria.
  • Yossi Dagan announced the acceleration of the project during a site inspection with officials.
  • The expansion is seen as crucial for settlement growth and strengthening Israeli sovereignty.

The Head of the Samaria Regional Council, Yossi Dagan, announced on Wednesday the acceleration of work to widen Highway 505, specifically the section between the Ariel junction and the Tapuah junction. This extensive infrastructure project, estimated to cost half a billion shekels, aims to improve transportation accessibility and enable faster, more continuous travel in the region.

The decision to expedite the work was made during a professional tour of the site by Dagan, accompanied by managers from Netivei Israel, contractors, and other professionals. The tour focused on the project's progress and necessary steps for completion. The current phase involves doubling the lanes on the highway from Ariel junction to Tapuah junction.

Furthermore, plans to double the lanes eastward from Tapuah junction towards the Jordan Valley are in advanced stages. Once all planned sections are completed, a 100-kilometer transportation corridor will be established, stretching from Glilot junction to the Jordan Valley. This corridor will feature two lanes in each direction, allowing for continuous travel at speeds of up to 100 km/h.

Dagan stated that the accelerated work, costing over half a billion shekels, is underway to ensure residents can travel from Tel Aviv to the "spine of the mountains" on a dual carriageway without interruption. He emphasized that the Highway 505 expansion is part of a broader transportation plan to create a direct link between central Israel, Samaria, and the Jordan Valley, calling it a "significant part of the overarching project to connect Glilot junction to the Jordan Valley road, from the river to the sea."

Dagan linked the infrastructure development to his vision of increasing the population in Samaria to one million residents, asserting that the region is becoming a central hub for Israel, not just historically and nationally, but also urbanistically and municipally. He thanked the Minister of Transportation Miri Regev, the Minister of Finance Bezalel Smotrich, the CEO of Netivei Israel Nissim Peretz, and other stakeholders for their cooperation. Dagan concluded that road infrastructure development is essential for continued settlement growth and strengthening sovereignty in the heart of the country, calling it another strategic step towards their goal of one million residents in Samaria.

SrugimRight · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

Mentioned

Full coverage · 2 outlets
First: Srugim · Nov 18

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Open the Wire