Israel Halts Repair Work at Haifa Refinery Over Cancerous Benzene Levels
Translated & summarized from Davar by baba
Israel's Ministry of Environmental Protection has blocked repair work at the Gadiv factory in Haifa due to repeated, dangerous spikes in carcinogenic benzene levels. The violations, which have caused school closures, led to the ministry denying Bazan Group's requests to resume essential repairs. The factory, damaged by an Iranian missile, remains shut down in high-benzene areas pending a safety reassessment.
The story in 5 lines · by baba
- Ministry of Environmental Protection denied repair work resumption at Haifa's Gadiv factory due to benzene violations.
- Repeated benzene spikes, a carcinogen, led to school closures and a prolonged facility shutdown.
- Bazan Group deems repairs critical for factory operations and Israel's strategic fuel reserves.
- The factory sustained damage from an Iranian missile during Operation "Shattered Oats."
- Ministry requires a safety reassessment before allowing work in high-benzene areas.
The Ministry of Environmental Protection has denied requests to resume repair work at the Gadiv factory, part of the Bazan Group in Haifa Bay, due to repeated violations of benzene concentration limits. The work, which began on October 9, was halted twice last month by the ministry following spikes in benzene, a known carcinogen, which also led to the closure of two local schools. Benzene, while common in urban environments from sources like vehicles and smoking, poses a public health risk at high concentrations typically linked to heavy industry or burning plastics.
The ministry stated that new guidelines, issued Wednesday, permit repairs only in facilities with low benzene levels, excluding the main Gadiv facility where levels remain high. "The ministry's responsibility is to ensure that maintenance work at the factory is carried out in the safest way possible for the public and the environment," said Doris Ziv, Director of the Haifa District at the Ministry of Environmental Protection. She emphasized that the ongoing benzene violations necessitate a reassessment of the work procedures, and current measures are insufficient.
Bazan considers the repairs essential for the factory's operation and Israel's strategic fuel reserves, especially after the facility sustained direct damage from an Iranian missile during Operation "Shattered Oats." Despite initial work stoppages on October 11 leading to a rapid decrease in benzene levels, sharp increases were recorded again on October 12, prompting school closures and public health warnings. Although the ministry allowed gradual resumption of work with additional filtering measures by October 18, a significant benzene increase on October 22 led to the prolonged shutdown of the facility, which continues to this day.
The ministry asserted it is acting responsibly towards Bazan and the work's needs but cannot permit further leaks. They will not allow operations in high-benzene facilities until a reassessment confirms safe execution, while maintaining ongoing professional dialogue with the factory's management.
The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.
Left 1Other 1
Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.