Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

News Plus

Welcome, one more step

The cross-newsroom layer: who covered a story, who didn’t, and how each one worded it. Plus your own news, on every device.

Follow your news

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories
  • The daily brief by email

See the coverage

  • Headlines side by side
  • Who reported first
  • Every newsroom clip, from every platform
  • Every newsroom photo on a story

Go deeper

  • The whole archive
  • Your reading diet
  • Duki without the daily limit
  • The Desk: the news, spoken every hour
  • Catch Me Up, and what changed since you read it
  • The Wire

Free stays free: the live wire, Not Everywhere, the brief, five follows and five Duki questions a day.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

News Plus · Ask Duki

Keep asking Duki

A free account gets five questions a day. News Plus lifts the daily limit.

Also in News Plus

  • The whole archive
  • Headlines side by side
  • Who reported first
  • The Desk, every hour
Ongoing Story· Day 2

Government Advances Power Plant Plans Despite Environmental Minister's Opposition

4 developments

MaarivSecurity

Israel Advances New Ashdod Power Plant Despite Environmental Concerns

Translated & summarized from Maariv by baba

CenterNeutral tone

Hebrew · 3 newsrooms covering

The Israeli government has approved the planning of a new natural gas power plant in Ashdod, despite opposition from the Ministry of Environmental Protection and local authorities concerned about air quality. Professionals within the ministry had advised against the project due to existing pollution in the Ashdod industrial zone. A similar proposal for a power plant in Palmachim was temporarily halted after local council opposition, though it may be reconsidered. The government's move aligns with its policy to increase natural gas electricity generation capacity.

The story in 6 lines · by baba

  • The Israeli government advanced plans for a new natural gas power plant in Ashdod.
  • The Ministry of Environmental Protection opposed the Ashdod plant due to existing pollution.
  • Ashdod's industrial zone has the highest VOC emissions and second-highest NOx emissions in Israel.
  • A similar power plant proposal in Palmachim was postponed after local council objections.
  • The Ministry of Environmental Protection questioned the need for more fossil fuel plants, favoring energy storage.
  • The government is pursuing a policy to increase natural gas electricity generation capacity.

The Israeli government has cleared the way for the planning of a new natural gas power plant in Ashdod, overriding objections from the Ministry of Environmental Protection and local authorities. Professionals within the Ministry of Environmental Protection had recommended that Minister Idit Silman oppose the plan due to the existing environmental strain in Ashdod's northern industrial zone. This area already hosts a refinery, four power plants generating nearly 2,000 megawatts, industrial and chemical facilities, seaports, and fuel depots. According to 2024 emissions data, the Ashdod industrial zone has the highest volatile organic compound emissions among Israeli industrial areas and ranks second for nitrogen oxide and suspected carcinogen emissions. The ministry warned that adding another fossil fuel power plant could worsen air quality and hinder efforts to meet national air pollution reduction targets for the Ashdod area.

Despite these concerns, the government is moving forward. The Planning Administration also noted the northern industrial zone is already saturated with existing and planned emission sources. Meanwhile, a similar proposal for a power plant in Palmachim was halted before a government vote. The plan to authorize "Park Palmachim Ltd." to advance a power plant in the Yavne industrial park was removed from the agenda following opposition from the Ganei Ravah Regional Council, led by Mira Ben Ari. The council stated they were informed of the proposal less than a day before it was to be discussed and demanded proper consultation and review of the plan's environmental and resident impact.

The Ministry of Environmental Protection and its professionals also opposed the Palmachim plan, which includes a plant of at least 630 megawatts. The ministry argued there was insufficient information on the need for additional fossil fuel plants and suggested that expanding energy storage capacity could reduce the need for such facilities. The ministry also pointed to the concentration of existing and planned infrastructure, including power plants and desalination facilities, in the Palmachim and Sorek area. While the Ashdod plan proceeds to the planning stages, the Palmachim proposal was postponed but not canceled, and could be revisited by the government.

MaarivCentre · Jerusalem

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

News Plus · Follows

You’ve used your five follows

News Plus follows as many newsrooms, topics and people as you like, with alerts for each in the app.

Your follows5 of 5 on the free plan
Or swap one out in Following

Also in News Plus

  • Alerts for what you follow
  • Hide read stories
  • The daily brief by email
  • Your reading diet

Sign in to baba News

Sign in to follow newsrooms, topics and people.

or use an email code

News Plus · Follows

You’ve used your five follows

News Plus follows as many newsrooms, topics and people as you like, with alerts for each in the app.

Your follows5 of 5 on the free plan
Or swap one out in Following

Also in News Plus

  • Alerts for what you follow
  • Hide read stories
  • The daily brief by email
  • Your reading diet

Mentioned

Full coverage · 3 outlets
First: Maariv · 6h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Related stories · 3

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the Wire