Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories (in the app)
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories (in the app)
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Ashdod Opens New Seaside Promenade on Northern Marina Pier

Translated & summarized from Channel 9 by baba
The story · English

Ashdod has opened its northern marina pier to the public, transforming a section of the coastline into an extension of the city's promenade. The new route, approximately 550 meters long, runs along the yacht marina and leads directly to the sea. The project is divided into two segments: a 250-meter section leading to the pier's gates and an additional 300 meters from the gates to the pier's end. This allows visitors to walk a significant portion of the breakwater, offering new views of Ashdod, the marina, and the open sea.

During the renovation, the existing path was improved with new lighting, railings on both sides of the breakwater, and designated rest areas with canopies. The pier features elevated seating areas for observing the water, and the space between its upper and lower levels is designed for various uses, including school events. Accessibility and safety were key considerations, with upgrades to the walkway, new railings, and enhancements to the wall separating the promenade from the marina's waters.

Planning for the project began in 2021, with a total cost of around 12 million shekels, of which 5.1 million was funded by the Ministry of Tourism. This initiative is part of Ashdod's broader coastal development plan, aiming to create a continuous tourist and recreational area along the shoreline. The new pier serves as a crucial link in this system, extending the promenade beyond the usual coastline and out towards the sea.

The main attraction of the new space is the dual perspective it offers: one side overlooks the yacht marina and the city skyline, while the other faces the open sea. The pier includes spots for visitors to sit and enjoy the view. The promenade is illuminated in the evening, extending its usability beyond daylight hours. The opening ceremony on September 24 included officials such as Tourism Ministry Director-General Michael Halachmi, Ashdod Mayor Yehiel Lasri, and other city and government representatives.

Read the original at Channel 9
Full coverage · 2 outlets
First: Kipa · 6h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Right 1Unrated 1
Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the live terminal