סיקור מלא· כללי· עודכן
Two-Week Traffic Disruptions Begin on Tel Aviv's KKL Bridge for Safety Repairs
Tel Aviv's KKL Bridge will undergo two weeks of safety repairs starting Saturday night, causing lane closures and heavy traffic. West-to-east lanes close first until August 21, then east-to-west lanes close from August 22 to 28. Ayalon Highway remains open but with traffic disruptions and public transport changes.
2 מערכות · שפה אחת · מאזPlus
מה קרה
- 01KKL Bridge in Tel Aviv closes west-to-east lanes from Aug 12 to 21 for safety repairs.
- 02East-to-west lanes close from Aug 22 to 28, extending traffic disruptions.
- 03Ayalon Highway lanes remain open but with heavy congestion expected.
- 04Left turn from Ayalon south to KKL Bridge is blocked during closures.
- 05Pedestrian crossing remains available via northern bridge section.
- 06Public transport routes and stops will be altered during the works.
הסיקור
2 מערכות על הידיעה
מי סיקר
- שמאלאין
- מרכז1
- ימין1
- חרדיתאין
- ערביתאין
איך הידיעה התפרסמה
ראו מי מבין 2 המערכות פרסם ראשון, ומי חיכה