התחברות ל-baba News

חשבון אחד לאתר, לאייפון ולאנדרואיד — המנוי נשאר איתכם.

או קוד במייל

חיפוש סיפורים

הקלידו לפחות שני תווים. התוצאות מגיעות מכל המערכות ש-baba קורא.

↑↓ למעבר · ↵ לפתיחה · esc לסגירה

התחברות ל-baba News

התחברו כדי להמשיך לשאול. News Plus מסיר את המגבלה היומית.

או קוד במייל

TheMarkerכללי

Israel's Light Rail Project Faces Delays, Cost Overruns

תומצת מתוך TheMarker על ידי baba

עסקיםטון ענייני

עברית · מערכת חדשות אחת

The CEO of Israel's NTA company admitted that the long light rail lines in Tel Aviv were a result of underestimating the need for a metro system, leading to significant delays and cost increases. The Red Line is now expected to open in early 2025, with other lines facing similar setbacks.

הידיעה ב-4 שורות · תקציר של baba

  • Israel's light rail lines are the world's longest due to initial underestimation of metro needs.
  • The Red Line's opening is delayed until early 2025, with other lines also behind schedule.
  • Project costs have risen to an estimated NIS 18.5 billion.
  • NTA CEO acknowledged public frustration and pledged to complete the project.

The CEO of NTA, Israel's national public transport infrastructure company, revealed that the company initially underestimated the need for a metro system, leading to the development of the world's longest light rail lines. This miscalculation has resulted in significant delays and cost overruns for the Tel Aviv light rail project.

The Red Line, which was supposed to open in 2021, is now expected to begin operations in early 2025. The delays are attributed to various factors, including complex engineering challenges and the need for extensive testing of the new train systems. The company is also facing difficulties in recruiting and training the necessary personnel to operate the lines.

In addition to the Red Line, NTA is also working on two additional lines, the Green and Purple lines, which are also experiencing delays. The Green Line is now slated for completion in 2027, and the Purple Line in 2028. The total cost of the Tel Aviv light rail project has ballooned to an estimated NIS 18.5 billion, significantly exceeding initial projections.

The CEO acknowledged the public's frustration with the ongoing delays and assured that NTA is working diligently to complete the project as quickly and safely as possible. He emphasized the importance of the light rail system for alleviating traffic congestion in the Tel Aviv metropolitan area and improving public transportation options for residents.

TheMarkerאחרים · תל אביב

התחברות ל-baba News

התחברו כדי לעקוב אחרי מערכות, נושאים ואנשים.

או קוד במייל

מוזכרים

ידיעות קשורות · 1

לא אותו אירוע: ידיעות אחרות שחולקות עם הידיעה הזו אנשים, מקומות או נושא. רקע, תגובות והמשכים.

פתיחת המבזקים