Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

By יובל ניסני
Economy02:50 · 1h ago

Tel Aviv Approves 75-Story Tower Amid Unresolved Land Contamination

Globes
Translated & summarized from Globes by baba
The story · English

Tel Aviv's local planning committee has approved a new plan for a 75-story, 340-meter-tall skyscraper in the city center, potentially one of Israel's tallest buildings. However, the project faces significant delays due to unresolved land contamination from a former military industry (TAAS) factory that operated on the site from 1948 to 1980. Despite the land being sold in 2017 for approximately NIS 155 million, and a new plan being advanced, the extensive pollution, including heavy metals, sulfates, and volatile organic compounds, has not been fully remediated.

The Ministry of Environmental Protection first flagged the severe contamination in 2017, demanding extensive soil testing, gas surveys, and the removal of contaminated soil. While some 400 tons of polluted soil were removed, crucial tests and full cleanup have not been completed. The ministry is awaiting final survey reports before determining further actions and environmental conditions for construction.

The Tel Aviv municipality stated that full remediation is still in progress and that obtaining any building permits will be contingent on completing soil gas sampling and receiving approval from environmental authorities. The Israel Land Authority, which sold the land, indicated that the winning bidder is responsible for fulfilling the ministry's remediation requirements.

The new plan significantly increases the building's scope compared to an earlier 2003 plan, allowing for nearly 90,650 square meters of office space, 5,000 square meters for public buildings, and 2,000 square meters for retail. Despite its proximity to public transportation, the tower is designed with limited parking, offering only about 230 spaces for private vehicles, alongside spots for motorcycles and bicycles.

Read the original at Globes
Open the live terminal