Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

By יובל אזולאי, שני אשכנזיOngoing story · 9 updates
Security13:13 · 1h ago

Israel's Desalination Crisis Continues: One Plant Fully Operational Amidst Algae Bloom

Calcalist
Translated & summarized from Calcalist by baba
The story · English

Nine days into a severe crisis affecting Israel's water desalination capabilities, only the Hadera plant is operating at full capacity. The Ashkelon and Ashdod facilities remain completely shut down due to high turbidity in seawater, while the Palmachim, Sorek A, and Sorek B plants are functioning partially. Efforts to mitigate the problem, including a trial dispersal of copper-containing compounds by crop dusters off the coast of Ashkelon to dissolve the algae, have proven unsuccessful.

"We are not seeing a significant change in turbidity levels," stated Energy Minister Eli Cohen. The head of the Water Authority, Hazi Lifshitz, confirmed the aerial dispersal was approved by an inter-ministerial committee, including representatives from the Health and Environmental Protection ministries, and asserted the materials used were non-toxic. The Water Authority is now exploring extending the intake pipes of the desalination plants further offshore to avoid high concentrations of algae, a solution previously mentioned by the Director General of the Energy Ministry.

Professional teams are also studying global methods for dealing with similar algal bloom issues. Minister Cohen dismissed any connection between the bloom and sewage discharge from Gaza, attributing the algae's origin to the Nile River and tracking its movement via satellite imagery. The partial operation of some plants is a measure to minimize damage to their filtration systems and maintain redundancy.

In parallel, the Energy Ministry and Water Authority will fund the purchase of new membranes for the desalination plants, an investment in the tens of millions of shekels. These membranes typically last seven years but can become blocked within a year if contaminated. Mekorot, the national water company, has increased pumping from the Sea of Galilee and approximately 1,000 groundwater wells across the country to compensate.

Minister Cohen reiterated that water supply to the public and agriculture remains secure, emphasizing the resilience and decentralization of Israel's water infrastructure. He stated that while full desalination capacity is not currently needed, the capability exists. Regarding water supply to Jordan, Cohen affirmed Israel's commitment to honoring its agreements but could not estimate the duration of the current crisis.

Read the original at Calcalist
Open the live terminal