General · Full coverage

Construction Begins on Third Metro Depot in Mesubim for Tel Aviv’s M3 Line

How 2 Israeli newsrooms covered this story — translated into English and compared side by side.

100% center
Center 2

First reported by Mako · 2 hours ago

What happened

Construction has begun on the Mesubim depot, the third facility for Tel Aviv’s M3 metro line, covering 350 dunams and opening in 2037. The M3 line will connect 10 municipalities from Bat Yam to Herzliya, serving 480,000 daily passengers and integrating with other transit systems.

  • 01Construction started on the Mesubim depot for the M3 metro line, covering 350 dunams.
  • 02The depot is part of a 3 billion shekel project opening in 2037.
  • 03M3 line will span 39 km with 25 stations across 10 municipalities.
  • 04The line connects Bat Yam to Herzliya, including a branch to Ben Gurion Airport.
  • 05M3 is expected to serve 480,000 passengers daily and link major hubs.
  • 06The depot joins two others already under construction for lines M1 and M2.

Summary translated & synthesized from the sources below by baba. Read each original for the full report.

Full coverage · 2 outlets

The same event, reported separately by each newsroom. Open a few to compare what each emphasizes — and what they leave out.

MakoCenter · Hebrew2 hours ago
Construction Begins on Third Metro Depot in Mesubim for Tel Aviv’s M3 Line
N12Center · Hebrew2 hours ago
Construction Begins on Third Metro Depot in Mesubim for Tel Aviv's M3 Line

Related stories

Israel Begins Major Metro Tunnel Excavation for New M2 Line Next MonthJul 8, 2026Metro Project Moves Forward as Oron Wins Two NTA ContractsJun 14, 2026Tel Aviv Metro Station Land Investment Gains Momentum as Local Plans Advance5 days ago“Significant Momentum”: The Sharon City Set for a Transport OverhaulJun 11, 2026One of Israel’s Busiest Train Stations Is Getting a Major MakeoverJun 11, 2026Tel Aviv Metro Project Seen as Key Economic Growth Driver Amid Infrastructure Challenges3 days ago