Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

By יניר יגנה
General17:04 · Jul 22

Beersheba's First Electric Grid Launched in 1949, Connecting to National Network by 1952

WallaCenter
Translated & summarized from Walla by baba
The story · English

In 1949, Beersheba, the capital of Israel's Negev region, began establishing its first electricity infrastructure to serve thousands of new immigrants. Initially, three diesel generators operated from a stone building in the old city, providing limited power only from 5 a.m. to midnight. On Israel's first Independence Day, the military governor ceremoniously switched on the city’s electric lights, illuminating a special display spelling "Negev," symbolizing hopes for southern development.

Despite this milestone, power outages were frequent and disruptive, affecting bakeries, flour supply, and even ice factories during the Negev's hot summers. Residents faced long lines for ice deliveries, and police were sometimes called due to tensions over electricity shortages. To address these issues, the Israel Electric Corporation began constructing a 32-kilometer high-voltage line connecting Beersheba to the national grid.

By July 1952, this connection was completed, providing Beersheba with a stable and continuous electricity supply for the first time. The original diesel generators were dismantled and relocated south to help establish Eilat’s initial power infrastructure. Today, Beersheba has grown into a city of over 200,000 residents, featuring a university, hospital, high-tech park, and new neighborhoods, reflecting the transformation since those early years.

Read the original at Walla
Open the live terminal