Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories (in the app)
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories (in the app)
  • The daily brief by email
  • Headlines side by side
  • Who reported first
  • The whole archive
  • Your reading diet
  • Duki without the monthly limit

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Security20:45 · 1h ago

Israel's Sorek A Desalination Plant Restores Full Operations After Algae Bloom

Ongoing story · 3 updates
Translated & summarized from NEWSru Israel by baba
The story · English

Israel's Sorek A desalination plant has resumed full operations after a bloom of microalgae in the Mediterranean Sea disrupted its work. Specialists report a decrease in the concentration of these algae in coastal waters, which had caused most of Israel's desalination plants to halt or reduce production in late August. The Sorek B plant is expected to return to full capacity within days. The Palmahim plant is currently operating at 75% capacity, while the Ashdod and Ashkelon plants are at 50% capacity. The algae, believed to have entered the Mediterranean from the Nile River via Egypt, traveled along the Levantine current to Israel's eastern coast. The resulting water turbidity clogged the membranes of the desalination facilities, leading to the temporary shutdown of five out of six plants. The Hadera plant, located furthest north, was the only facility that continued to operate at full capacity, even exceeding it to 105%, as the algae bloom did not significantly reach its area.

Read the original at NEWSru Israel
Open the live terminal