Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without the monthly limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Israel Railways Accelerates Coastal Route Project, Slashing Travel Times

By davidg
Translated & summarized from JDN by baba
The story · English

Israel Railways is moving forward with its high-speed coastal route project, with the first segment between Haifa and Dor set to begin construction soon. The contract for this segment, valued at hundreds of millions of shekels, has been awarded to Danya Cebus. The project, part of a broader urban development plan (Tatal 65a), involves building a double, electrified track spanning approximately 68 kilometers from Hof HaCarmel station in Haifa to Shefayim.

This significant infrastructure upgrade will add two high-speed tracks alongside the existing two suburban lines, enabling trains to reach speeds of up to 250 kilometers per hour. The plan includes upgrading and constructing new stations, such as one in Shefayim, rerouting sections to maintain high speeds, and implementing acoustic and environmental solutions, as well as grade separations. The initial tender for this segment was published in March 2026.

Upon completion of all segments, including the northern section (Tatal 65b) which involves tunneling in Haifa, the travel time between Haifa and Tel Aviv is expected to be reduced to about 30 minutes, with a single stop in Hadera. This will also increase the network's capacity to approximately 30,000 passengers per hour during peak times on the Haifa segment.

Despite the project's origins dating back to 2012 and facing numerous delays and objections, the target completion date for the entire high-speed coastal route is set for 2035.

Read the original at JDN
Full coverage · 3 outlets
First: Calcalist · 1h ago

The same event, reported separately by each outlet. Open a few to compare what different newsrooms emphasize — and what they leave out.

Right 1Unrated 2
Related stories · 5

Not the same event — other stories that share this one’s people, places, or theme: background, reactions, and follow-ups.

Open the live terminal