Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

Welcome — one more step

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without a daily limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

to move · to open · esc to close

Live Terminal

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

Keep the whole picture

News Plus opens the cross-newsroom layer — who covered a story, who didn’t, and how each one worded it.

  • Ask Duki without a daily limit — answers from the coverage, with sources
  • Save articles, synced between the web and the app
  • Every Not Everywhere story, no daily limit
  • How each newsroom worded the same event
  • Filing timeline and coverage breakdown
  • The whole archive, searchable
  • Unlimited newsroom, topic and people follows
  • The daily brief by email, in English or Hebrew

Eligible new subscribers get 7 days free, then $34.99 each year. Renews automatically until cancelled. Cancel any time in your account. Subscription terms.

Your subscription also unlocks the app.

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

By ליאת רוןOngoing story · 7 updates
Security12:26 · 48m ago

Israel Explores Deep Sea Pumping to Counter Algae Bloom Affecting Desalination Plants

WallaCenter
Translated & summarized from Walla by baba
The story · English

Eight days after a bloom of micro-algae, believed to have drifted from the Nile, disrupted Israel's desalination capabilities, national water company Mekorot is evaluating a novel solution to bypass the murky seawater. Engineers are considering extending intake pipes several kilometers further into the Mediterranean Sea to reach clearer waters, potentially installing multiple intake points to draw from deeper, cleaner sources. This comes after an earlier attempt to treat the algae by spraying a section of the sea near Ashkelon proved unsuccessful in improving water clarity.

Energy Minister Eli Cohen stated that the cost of extending the pipes would be relatively minor, with current major expenses focused on acquiring additional filters for the desalination plants to cope with prolonged turbidity and filter wear. Despite the ongoing operational disruptions and associated costs, Cohen assured the public that water tariffs would not increase, citing the water sector's annual revenue of 10 billion shekels and reduced costs during plant shutdowns.

While a full return to normal operations is not yet projected, Cohen confirmed that Israel's water supply commitments to Jordan, approximately 40 million cubic meters annually, would continue uninterrupted. He also asserted that Israel does not require external water assistance due to increased pumping from the Sea of Galilee and various groundwater wells across the country.

Cohen dismissed theories suggesting the pollution originated from the Gaza Strip, reiterating his stance that the micro-algae originated from the Nile and traveled along the Mediterranean coast. He emphasized that domestic water supply remains secure, with production exceeding consumption, and anticipates reduced demand as temperatures decrease. The high turbidity first appeared last weekend, leading to the shutdown of five out of six desalination plants. While drinking water supplies were largely unaffected, farmers and public spaces experienced impacts. Currently, only three plants are operational, with Hadera running at full capacity, Sorek 1 at one-third, and Palmahim at half capacity.

Read the original at Walla
Open the live terminal