Wire

Sign in to baba News

One account across the web, iPhone and Android — your subscription follows it.

or use an email code

News Plus

Welcome, one more step

The cross-newsroom layer: who covered a story, who didn’t, and how each one worded it. Plus your own news, on every device.

Follow your news

  • Unlimited follows
  • Alerts for what you follow (in the app)
  • Story alerts (in the app)
  • Hide read stories
  • The daily brief by email

See the coverage

  • Headlines side by side
  • Who reported first
  • Every newsroom clip, from every platform
  • Every newsroom photo on a story

Go deeper

  • The whole archive
  • Your reading diet
  • Duki without the daily limit
  • The Desk: the news, spoken every hour
  • Catch Me Up, and what changed since you read it
  • The Wire

Free stays free: the live wire, Not Everywhere, the brief, five follows and five Duki questions a day.

Search stories

Type at least two characters. Results come from every newsroom baba reads.

↑↓ to move · ↵ to open · esc to close

Sign in to baba News

Sign in to keep asking. News Plus removes the daily limit.

or use an email code

News Plus · Ask Duki

Keep asking Duki

A free account gets five questions a day. News Plus lifts the daily limit.

Also in News Plus

  • The whole archive
  • Headlines side by side
  • Who reported first
  • The Desk, every hour

Full coverage· Economy· Updated

Haifa Court Orders Partial Payment Hold in Dispute Over Gilboa Pumped Storage Facility

The Haifa District Court ruled that Noga cannot immediately deduct 75 million shekels from payments to PSP Investments over a 150 million shekel dispute related to the Gilboa pumped storage facility's shutdown. The court allowed gradual deduction of the remaining amount until the main case is resolved.

3 newsrooms · 1 language · since

Sign in to baba News

Sign in to save this article and find it on your phone.

or use an email code

Haifa Court Orders Partial Payment Hold in Dispute Over Gilboa Pumped Storage Facility
Illustration by baba

What happened

  1. 01Haifa court blocks Noga from deducting 75 million shekels immediately from PSP payments.
  2. 02Noga demanded 150 million shekels over Gilboa facility's prolonged shutdown costs.
  3. 03Court allows gradual deduction of remaining 75 million shekels at 5 million shekels monthly.
  4. 04Dispute centers on PSP's alleged failure to meet availability during Sept 2022-July 2023 repairs.
  5. 05PSP argues payment demand lacks legal basis and warns of severe cash flow harm.
  6. 06Gilboa pumped storage facility has 300 MW capacity and began operating in 2020.

The dispute involves costs claimed by Noga due to PSP's alleged failure to meet availability during repairs from September 2022 to July 2023.

Translated and summarized by baba from Calcalist, the latest report. Read Calcalist’s original

The coverage

3 newsrooms on this story

Who covered it

  • LeftNone
  • Centre1
  • Right1
  • HarediNone
  • ArabNone
  • Other1

How it broke

Plus

News Plus · Who reported first

See which newsroom broke it

The order the newsrooms filed in, and how long each side of the press waited before running the story.

Also in News Plus

  • Headlines side by side
  • Story alerts
  • The Wire
  • Unlimited follows