כלכלה · סיקור מלא
Electra Wins 2 Billion Shekel Contract for Major Highway 5 Fast Lane Project
איך 2 חדרי חדשות ישראליים סיפרו את הסיפור הזה, זה לצד זה.
Unrated 2
מאת אלון פרל
דווח לראשונה בCalcalist · Aug 18, 2026
מה קרה
Electra Ltd. won a 2 billion shekel contract to build a 25-kilometer two-way fast lane on Highway 5, including a large parking and transportation complex at Kesem Interchange. The project, expected to start operations in 2031, aims to ease congestion in the Tel Aviv metropolitan area and will be operated under a 25-year concession.
- 01Electra won a 2 billion shekel tender for Highway 5 fast lanes and a transportation complex.
- 02The project includes a 25 km two-way fast lane and 3,200 parking spaces at Kesem Interchange.
- 03Electra expects 3.9 billion shekels in revenue over the 25-year concession.
- 04The fast lanes will connect with Highways 20 and 2, improving access to Tel Aviv.
- 05Operations are planned to begin in 2031 after a 3-year construction period.
- 06The tender involved five major Israeli and international consortia.
התקציר תורגם וסוכם מהמקורות למטה על ידי baba. לקריאה המלאה פתחו כל מקור.
סיקור מלא · 2 מקורות
אותו אירוע, כפי שכל חדר חדשות דיווח עליו בנפרד. פתחו כמה כדי להשוות במה כל אחד מדגיש ומה הוא משמיט.
סיפורים קשורים
Partner Group Wins National Congestion Tax Communications Contract Worth 100 Million ShekelsJul 29, 2026Oron Group Wins $545 Million Contract to Upgrade Israel's Busy Highway 4 with Two New InterchangesJun 30, 2026Shapir Wins $2 Billion Contract to Extend Israel's Highway 6 to Northern RegionJul 16, 2026נתיב חדש באיילון ייפתח בקרוב. מתי תגיע האגרה?3 days agoElectra Expands Transportation Operations by Acquiring Control of Southern Israel Shuttle CompanyAug 5, 2026Ayalon and Coastal Highways to Close Overnight for Signage Work on Fast Lanes ProjectAug 2, 2026